Cubic Yard Concrete Converter

Enter a concrete volume — or the dimensions of a slab, footing or landing — and get it converted to cubic feet, yards, meters, liters and gallons, plus the ready-mix order size and bag count you'd actually order.

Free to use No sign-up required Exact SI/US conversion factors Imperial & metric output together
ft³, yd³, m³, L & gal calculated Ready-mix order size included Bag count estimated Last verified July 2026
Unit conversions here are exact, defined SI/US factors. Ordering figures — waste %, order increments, short-load minimums — reflect common industry practice and vary by supplier; confirm with your local ready-mix plant before ordering.
ft³

Paste in the volume another calculator gave you — e.g. the Concrete Stairs Calculator's cubic feet result.

Most estimators add 5–10% over the raw calculated volumeVERIFY to cover spillage, subgrade irregularity and form loss.

Advanced: ordering assumptions

Most plants round orders up to the nearest 1/4 yardVERIFY — confirm your local plant's actual billing increment.

yd³

Orders under this size often carry a short-load feeVERIFY. Thresholds and fees vary widely by region and supplier — call ahead.

Order-size gauge and cubic yard reference diagram

Results

Cubic Feet
ft³
Cubic Yards
yd³
Cubic Meters
Liters
L
US Gallons
gal
Waste-Adjusted
yd³
Ready-Mix Order
yd³
60 lb Bags
bags
80 lb Bags
bags
How to use this converter

Getting from "a number on another page" to an order size

This tool doesn't measure your stair or footing — it takes a volume you already have (or a quick box shape) and turns it into what you can actually hand a supplier.

1

Get your raw volume

Pull the cubic footage from a project-specific calculator — the Concrete Stairs Calculator, Stair Footing Size Calculator, or a hand measurement — and enter it under "I have a volume." If you only have a rectangular slab or footing, switch to "Calculate from dimensions" instead.

2

Set your waste allowance

Concrete estimating always adds a buffer over the theoretical volume. 10% is a common default for hand-dug or irregular forms; drop to 5% for a clean, formed pour with a known subgrade.

3

Check the ready-mix order size

The Ready-Mix Order result is your waste-adjusted volume rounded up to the plant's actual billing increment — this, not the raw calculated number, is what you order.

4

Compare against bags

For small pours, look at the 60 lb / 80 lb bag counts. Once you're past roughly 40–50 bags, a small ready-mix load or a mini-mix/volumetric truck is usually cheaper and far less labor.

The math

The five formulas behind every result

Nothing on this page is a black box. Here's exactly what runs when you change a number.

Volume from Dimensions

V (ft³) = L(ft) × W(ft) × [D(in) ÷ 12]

Simple rectangular box volume for a slab, footing or pad. Length and width in feet, depth in inches converted to feet.

Cubic Feet → Cubic Yards

yd³ = ft³ ÷ 27

A yard is 3 ft on a side, so a cubic yard is 3×3×3 = 27 cubic feet — the number every ready-mix order is priced against.

Cubic Yards → Metric

m³ = yd³ × 0.764555    L = m³ × 1000

0.764555 is the exact defined conversion (1 yard = 0.9144 m, cubed) — not a rounded estimate.

Waste-Adjusted Order

Order = ceil( (yd³ × (1+waste%)) ÷ increment ) × increment

Add the waste allowance first, then round up to the plant's real billing increment — rounding before adding waste can leave you short.

Bag Count Equivalent

Bags = [ft³ × (1+waste%)] ÷ bag yield (ft³)

Waste-adjusted cubic footage divided by the mixed yield of one bag, rounded up — you can't buy a fraction of a bag.

Worked example

Walking through a 38.5 ft³ set of steps

Same volume this page loads with by default — the cubic footage a Concrete Stairs Calculator run might return for three exterior steps and a small landing.

1

Convert the raw volume

38.5 ft³ ÷ 27 = 1.43 yd³. That's the true volume of concrete the steps contain, with zero allowance for spillage or waste.

2

Add the waste allowance

At the default 10%: 1.43 × 1.10 = 1.57 yd³. This is what you should actually plan to have on site, not the theoretical number from step 1.

3

Round to the order increment

Rounding 1.57 yd³ up to the nearest 1/4 yard gives a 1.75 yd³ ready-mix order — the plant can't sell you 1.57 yards exactly, so the order always ticks up to the next increment.

4

Check against the short-load threshold

1.75 yd³ sits well under the typical 3 yd³ short-load minimum, so a short-load fee is likely on a ready-mix delivery. At the same waste-adjusted volume, bagged concrete works out to roughly 57 bags at 80 lb each — worth pricing both options before deciding.

This is exactly why the Ready-Mix Order result can jump a full quarter-yard from a small change in waste % — the rounding step always rounds up, never down, so a waste allowance that pushes you just past an increment boundary costs a full extra 1/4 yard.

Unit reference

Concrete volume conversion factors

These are exact, defined conversions — not rounded estimates.

FromToMultiply byNotes
Cubic feetCubic yards÷ 27Exact — a yard is 3 ft per side.
Cubic yardsCubic meters× 0.764555Exact SI conversion (1 yd = 0.9144 m).
Cubic metersLiters× 1000Exact, by definition.
Cubic feetUS gallons× 7.480519Exact (1 US gal = 231 in³).
Cubic yardsUS gallons× 201.974Exact, derived from the two rows above.
Bag reference

Bagged concrete yield by size

Mixed yield — not bag weight — is what determines how many bags fill a given volume.

Bag SizeMixed YieldBags per Cubic YardTypical Use
40 lb≈ 0.30 ft³VERIFY≈ 90Small repairs, post anchoring, patching.
60 lb≈ 0.45 ft³VERIFY≈ 60Most common size for footings and small pads.
80 lb≈ 0.60 ft³VERIFY≈ 45Larger pours where fewer, heavier bags reduce trips.

Yields are commonly published figures for standard concrete mixes and are consistent across most major bagged-mix brands, but always confirm the number printed on your specific bag before ordering by count — the 60 lb and 80 lb outputs above use these same figures.

Beyond the raw number

Ready-mix vs. bagged: ordering the right way

A correct volume conversion can still lead to the wrong order if it ignores how concrete actually gets sold — this section covers the three things that trip people up.

Why waste comes before rounding

Order = round_up( V × (1+waste%) )

Adding waste after rounding can leave you exactly one increment short on pour day. Always inflate the volume for waste first, then round up to the plant's increment — never the reverse.

Short loads cost more per yard

Fee likely if Order < ~3 yd³VERIFY

A truck partially loaded still costs the plant close to a full dispatch, so small orders often carry a flat short-load fee — sometimes larger than the material cost itself. Ask your supplier for their exact threshold before you commit to a delivery.

The bags-vs-truck crossover

~45–60 bags ≈ 1 yd³VERIFY

Below roughly a third of a yard, bagged concrete is usually cheaper and simpler than paying a short-load fee. Above about half a yard, the labor of mixing 30+ bags by hand typically outweighs any delivery fee — a mini-mix or volumetric truck is worth pricing at that point.

Volumetric (mini-mix) trucks

Billed by material used, not truck size

These trucks mix on site from raw ingredients and only charge for what's actually poured, which sidesteps both the short-load fee and the leftover-concrete problem of a standard dispatch truck — useful for odd, in-between volumes like this example's 1.75 yd³.

These are ordering-stage planning figures based on common industry practice, not a fixed pricing rule — actual thresholds, fees and increments are set entirely by your local supplier.

Avoid these

Common mistakes when converting and ordering concrete

Most concrete-ordering headaches trace back to one of these five errors, not to bad math.

📉

Ordering the exact calculated volume

Zero waste allowance means any spillage, over-excavation or forming imprecision leaves you short mid-pour, with a second truck or a rush bag run to cover the gap.

🔀

Confusing cubic feet with square feet

A footing calculator's area output and its volume output look similar at a glance — feeding a square-footage number into this converter as if it were cubic feet silently understates the order.

🔢

Not rounding to the plant's real increment

Ordering a precise decimal like 1.57 yd³ instead of the rounded 1.75 yd³ this page recommends often just gets rounded by the plant anyway — better to know the number in advance.

🏷️

Assuming every bag yields the same volume

Mixed yield varies slightly by brand and mix design. Buying by weight alone, without checking the yield on the bag, can leave a small pour a few bags short.

💵

Not asking about short-load fees upfront

A small order that seems cheap on paper can end up costing more per yard than a full load once the short-load fee lands on the invoice — always ask before scheduling.

⏱️

Underestimating bag-mixing labor

Forty or fifty 80 lb bags is well over a ton of material to mix by hand or with a small mixer — a volume that looks small in cubic yards can still be a full day's labor in bags.

Who uses this

When to use a concrete volume converter

This tool is the last step before placing an order, across almost any small-to-mid concrete project.

🪜

Exterior Steps & Landing

Turning a Concrete Stairs Calculator result into an actual order size.

🏗️

Deck or Stair Footings

Converting footing volume for one or several posts before a bag or truck order.

🧱

Small Patio or Pad

Sizing a slab pour for a shed base, AC pad, or garden patio.

🛣️

Curb or Ramp Pour

Estimating a short accessibility ramp or curb section.

🧗

Retaining Wall Footing

Converting a long, narrow strip footing's volume for ordering.

🚗

Garage or Shed Slab

Checking whether a slab pour clears the short-load threshold or needs bags.

FAQ

Common questions

How many cubic feet are in a cubic yard of concrete?
Exactly 27. A cubic yard is 3 feet on every side, so 3 × 3 × 3 = 27 cubic feet — this applies to concrete or any other material.
How many bags of concrete make a cubic yard?
Roughly 60 bags at 60 lb each, or roughly 45 bags at 80 lb each, based on commonly published mixed yields. Always check the yield printed on your specific bag, since it varies slightly by brand and mix.
How much does a cubic yard of concrete weigh?
A typical normal-weight concrete mix weighs approximately 4,000 lb per cubic yard, though this varies with the aggregate and mix design used.
How much extra concrete should I order for waste?
Most estimators add 5–10% over the calculated volume to cover spillage, over-excavation and subgrade irregularity. Rougher, hand-dug forms typically warrant the higher end of that range.
What is a short load in concrete ordering?
A delivery below the plant's typical minimum truck load, commonly cited around 3 cubic yards, though the exact figure and any fee vary by supplier. A partially loaded truck still costs the plant close to a full dispatch, so short loads are often billed at a premium.
Should I order concrete by cubic yards or cubic feet?
Ready-mix plants price and dispatch by the cubic yard, almost universally in the US. Cubic feet is the more natural unit for calculating a small volume, but always convert to yards — rounded to the plant's order increment — before calling to order.
How do I convert cubic yards to cubic meters?
Multiply cubic yards by 0.764555 — an exact conversion, since one yard equals exactly 0.9144 meters. This converter handles it automatically alongside liters and US gallons.
Is it cheaper to use bags or order ready-mix?
For very small volumes, bags usually win because a ready-mix short load can carry a flat fee larger than the material cost. As volume climbs past roughly half a yard, the labor of hand-mixing dozens of bags typically tips the balance toward a small ready-mix or volumetric truck order — price both for your specific volume.
Why did my ready-mix order round up more than expected?
The order size is your waste-adjusted volume rounded up to the plant's billing increment, commonly a quarter yard. Because rounding always goes up, a waste allowance that pushes the volume just past an increment boundary adds a full extra increment to the order.
Can I use this for concrete other than stairs?
Yes — the unit math, waste allowance, and ordering logic apply to any concrete volume: footings, slabs, pads, curbs or walls. Only the worked example on this page is stair-specific.
What does the dimensions mode calculate?
A simple rectangular box volume — length times width times depth — suited to a flat slab, pad or footing. It doesn't account for stepped stair geometry; for that, use the Concrete Stairs Calculator and paste its cubic-footage result into this page's volume field.
Do liters and gallons matter for concrete?
Rarely for ordering, but they're useful for cross-checking mix-water ratios or comparing against equipment rated in those units, such as a portable mixer's drum capacity.